Well Completion and Servicing

ISBN9782710807650 EditorÉditions Technip pages328 Published1999-01-01
Author
Buy paper version
@ $166.00
Share
1. Introduction to completion. 1.1. Main factors influencing completion design. 1.2. Overall approach to a well's flow capacity. 1.3. Major types of completion configurations. 1.4. Main phases in completion.
2. Connecting the pay zone and the borehole. 2.1. Drilling and casing the pay zone. 2.2. Evaluating and restoring the cement job. 2.3. Perforating. 2.4. Treating the pay zone. 2.5. The special case of horizontal wells.
3. The equipment of naturally flowing wells. 3.1. General configuration of flowing well equipment. 3.2. The production wellhead. 3.3. The production string or tubing. 3.4. Packers. 3.5. Downhole equipment. 3.6. Subsurface safety valves. 3.7. Running procedure.
4. Artificial lift. 4.1. Pumping. 4.2. Gas lift. 4.3. Choosing an artificial lift process.
5. Well servicing and workover. 5.1. Main types of operations. 5.2. Light operations on live wells. 5.3. Heavy operations on live wells. 5.4. Operations on killed wells. 5.5. Special cases. Bibliography. Index.